![]() In an interview with Offshore Engineer, Odjfell OceanWind's CEO shared more information on the agreement. Draugen achieved peak output of about 225 000 bopd in 2001.īack in October 2021, OKEA also signed an agreement for a project that could see the Draugen platform powered by floating wind turbines to be supplied by Odfjell OceanWind. OKEA acquired its interests in the Draugen and Gjøa offshore fields in Norway for 4.52 Billion NOK from Shell in 2018. ![]() Photo: A/S Norske Shell/Norwegian Petroleum Museum. OKEA operates the giant Draugen platform at the namesake field off Norway, which started producing oil in October 1993. Model tests with the Heidrun tension-leg platform found that large irregular waves created oscillations which had a big impact on total tension in the tethers. The project is scheduled to be completed in 2026. Lifetime -extension of these platforms are of crucial importance for the increasing need for energy and energy security in Europe," said Paal Eikeseth, executive vice president and head of Aker Solutions' Electrification, Maintenance and Modifications (EMM) business.Īccording to the company, lifetime-extension of the field can result in 20 years of production and value creation. "Replacing the current power generation from gas turbines at the offshore platform and instead electrifying these from shore will enable production of oil and gas from Draugen with significant reductions in CO2 emissions. As a result of this, the emissions from Draugen are estimated to be reduced by as much as 200,000 tons of CO2 per year. The project will involve major modifications of the existing platform to enable power from shore. ![]() A Draugen, as Norse fans are no doubt aware of, is an undead monster known as an again-walker. OKEA has selected Aker Solutions as the main contractor for Engineering, Procurement, Construction, and Installation (EPCI). Platform PC (out now), Xbox One and PlayStation 4 (later this year) Publisher. Aker Solutions defines a substantial contract as between NOK 2.5 billion (currently at around $241 and NOK 4.0 billion (currently at around $385 million) The Draugen oil field sits in about 250 meters of water, and is located around 150 kilometers north of Kristiansund.Īker Solutions said the contract had substantial value. ![]() The theory of power maximization suggests that the optimal pressure ratio of the air compressor is 2.80, leading to an exhaust gas temperature of 145.5 ☌. Norwegian offshore engineering and construction company Aker Solutions has signed a firm contract with oil firm OKEA for the electrification of OKEA's Draugen platform in the Norwegian Sea, offshore Norway. An air bottoming cycle is design to recover the waste heat from the SGT-500 gas turbine installed on the Draugen platform, Norway, in the North Sea. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |